A health score you can actually defend.

A red or green that nobody can explain helps no one. Husn grounds each project's health in the work itself and shows you exactly why the score is where it is.

Husn reads your tools - never changes them

Health score detail, today3 to know
  • Project Orion dropped to at risk, driven by two blockers aging past a week.
    Risk
  • Throughput fell by a third over two sprints with no change in scope on paper.
    Changed
  • A project still scored green has not updated its plan in twelve days.
    Watch
Scored from live signals - 3 reasons attached - 0 guesswork
The problem

Project health score

Most health scores are a feeling, picked by the person filling in the report. Two projects in identical trouble can show different colors depending on who is reporting, and nobody can trace a score back to anything concrete.

  • Scores are self reported, so they measure the reporter's mood as much as the project's state.
  • A color with no explanation cannot be challenged, defended, or acted on with any confidence.
  • Health is reported on a cycle, so a project can turn red days before the report admits it.
Why this gets hard at scale

Why this gets hard at scale

01

Across many projects, inconsistent scoring makes comparison meaningless, the thing a portfolio most needs from a score.

02

A score is only useful if you trust the inputs, and hand picked colors give you nothing to trust.

03

Recomputing honest health for every project by hand is impossible at scale, so it gets approximated and the approximation drifts.

How Husn helps
Step 01Husn derives health from real signals across Jira, Slack, and docs, so the score reflects the work rather than the reporter.
Step 02Every score comes with its reasons, the slipped dependency, the aging blocker, the quiet scope change behind it.
Step 03Health updates as the work moves, so a project that starts to slip shows it before the next reporting cycle.

Husn reads and reasons, and never changes your tools.

Use cases

Honest status

Replace a hand picked color with a score that reflects the work and explains itself.

Comparing projects

Rank projects on the same consistent basis, so attention goes where the work, not the reporting, says it should.

Early warning

Catch the project sliding from green to amber while there is still time to act, not after.

Who this is for

Built for the people who have to keep it all straight.

  • Delivery managers
  • Program managers and TPMs
  • PMO analysts
  • Engineering leaders
FAQ

Questions, answered.

  • How is the score calculated?

    From real signals in the work, such as slipping dependencies, aging blockers, throughput changes, and quiet scope shifts, each shown as a reason behind the score.

  • Can teams still set their own status?

    They can, and Husn will show where a self reported status and the work based score disagree, which is often the most useful signal of all.

  • Does Husn change our projects?

    No. It reads the work to compute the score and never writes anything back.

  • How often does the score update?

    Continuously, as the underlying work changes, rather than on a reporting cadence.

Detect issues before they become incidents.

Score project health on the work, not a guess.

Connect your projects and Husn will score each one from live signals, with the reasons attached, in about fifteen minutes.